February 8, 2013 - Arad is an Israeli company which supplies water infrastructure in Israel’s illegal settlements in the West Bank and is gaining contracts to supply equipment to water companies in the UK. It has gained a contract to provide Southern Water with Ł7.1 million worth of water meters annually for five years with the option to extend when the contract expires. The contract was signed in February 2010 and the meters are currently being installed. Arad is also providing pressure sensors to the Welsh water utility.
Arad has installed 3,200 water meters in the illegal Israeli settlement of Ariel and the Barkan settlement industrial zone. The water system is managed by the Mei Ariel Water Corporation.
Arad also develops water meters for the Israeli state owned company Mekorot. Mekorot has a near monopoly on water supply in Israel and also operates and develops water infrastructure in Area C of the West Bank, where Palestinians are forbidden to develop even basic water infrastructure.
Palestinians living in Area C, unable to access piped water due to the restrictions on building imposed by the Israeli Civil Administration, are often forced to fill up water tanks, transported by tractor, at Mekorot’s water facilities. These fenced water facilities are often situated beside Palestinian communities and draw water from occupied Palestinian territory.
Water is also used as a tool in the ethnic cleansing of Palestinian communities. Water is denied to these communities as a way to push them off the land on which they live and into urban centres so that their land can be expropriated by the settlements. For example Bedouin man from Khan Al Ahmar, where the entire community is currently under threat of home demolitions and relocation, told Corporate Watch, back in 2009, that he had to to drive a mobile water tank by tractor to Jericho and pay to have it filled up with water from Mekorot. This journey takes between half an hour and an hour. Despite the fact that the nearby settlement has several large water tanks, surrounded by strong fencing, the tents which the Bedouin live in have no access to running water and they are not allowed to use the water located right next to them. Corporate Watch visited Khan Al Ahmar in 2013 and this situation had not changed.
Arad has been awarded contracts in the US , Brazil and HaCarmel 6, Industrial Area
Yokneam 20692
Israel
Tel: 972-4-9935222
Fax: 972-4-9935227
www.aradtec.com Master Meter Inc.
101 Regency Parkway
Mansfield, TX 76063
USA
Tel: 817-842-8000
Fax: 817-842-8100
E-mail:info@mastermeter.com
www.mastermeter.com Contazara S.A.
Ctra. Castellón A-68, km 5.5
50720 Zaragoza
Spain
Tel: 976-50-06-91
Fax: 976-50-06-54
www.contazara.es Southern Water can be contacted < href="www.southernwater.co.uk/about-us/contact-us/">here. For photos, see: http://corporateoccupation.org/arad-supplying-water-meters-to-sussex-while-helping-bleed-palestine-dry/